Installing the power input retention bracket, Mounting, Horizontal/rack – MGE UPS Systems Rackmount PDU User Manual

Page 7: Vertical/tower, Getting started

Advertising
background image

Getting Started

Installing the Power Input Retention Bracket

For PDUs with detachable input power cordsets, it may be necessary
to install the power input retention bracket prior to mounting the PDU
within the rack.

To install the power input retention bracket:

1.

Remove the two screws attaching the IEC 60320 C19 inlet to the
enclosure.

2.

Assemble and attach the retention bracket to the enclosure as
shown.

Figure 2: Retention Bracket assembly

Mounting

Figure 3: Mounting

Horizontal/Rack

1.

Select the appropriate bracket mounting points
for proper mounting depth within the rack.

2.

Attach the brackets to these mounting points
with two screws for each bracket.

3.

Install the enclosure into your rack, using the
slots in each bracket. The slots allow about ¼
inch of horizontal adaptability to align with the
mounting holes of your rack.

Vertical/Tower

1.

Attach the removable flanges to the mount points on the rear of
the enclosure using M4 screws.

2.

Attach the mounting L-brackets to the flanges with the
supplied screws, washers and nut plates. The slots allow
about 1½ inches of vertical adaptability.

3.

Attach the top and bottom brackets to your rack.

301-0399-2.doc - Page 5

Advertising