Cdvx series direct vent gas fireplace – Majestic Appliances Builder Direct Vent 36CDVXTRN User Manual

Page 21

Advertising
background image

21

CDVX Series Direct Vent Gas Fireplace

20012253

CFM100

Firestop-Vertical

09/20/00

11"

11"

Joist

Joist

Firestop Spacer

Nails (4)

Upper Floor

Attic Insulation
Shield

Ceiling
Installation

CFM100

Fig. 38 Place firestop spacer(s) and secure.

If there is room above ceiling level,
firestop spacer must be installed on both
the bottom and the top side of the ceiling
joists. If an attic is above ceiling level a
7DVAIS (Attic Insulation Shield) must be
installed. (Fig. 38)

7. Install roof support (Fig. 39) and roof flashing making

sure upper flange is below the shingles. (Fig. 40)

8. Install appropriate pipe sections until the venting is

above the flashing. (Fig. 40)

9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. (Fig

41)

TWL101a

Twist Lock Pipe

2/8/99 djt

3 #5 Sheet Metal

Screws per Joint

Storm Collar

TWL101a

Fig. 40 Roof flashing.

Sealant

FP1022

Typical Straight Up Installation

1/26/00 djt

50’

(15 m)

Storm Collar

Roof Flash-

ing

Vent

Termination

Roof

2’ Min.

Roof Support

Attic Insulation

Shield

Attic

Insulation

Joists

Joists

FP1022

Fig. 39 Typical straight-up installation.

Min.

2' (610 mm)

FP1185

Fig. 41 Minimum termination to roof clearance.

The enlarged ends of the vent section
always face down. (Fig. 37)

Advertising