Final installation – Martin Fireplaces BV4536 User Manual

Page 22

Advertising
background image

FINAL INSTALLATION

FINAL INSTALLATION

21

Log Placement for fiber VDY24/18D3R:

Step 1: Line up pins on bottom of Rear Log #1 with pins on
grate bar and place on grate.

Step 2: Place Front Left Log #2 on left front of grate bar lining
up cutout in bottom of log with grate bar.

Step 3: Place Front Right Log #3 on right front of grate bar
lining up cutout in bottom of log with grate bar. Make sure Log
#3 touches Log #1.

Step 4: Place back end Top Middle Log #4 on Log #1. Press the
side of Log #4 up against raised area of Log #1. Line up notch in
front end of #4 with grate bar.

Step 5: Rest Top Right Log #5 on Log #3.

Step 6: Line up Top Left Log #6 with notches on Log #2 and
Log #4

Figure 19: Log Placement

Advertising
This manual is related to the following products: