ANCHORING TO CONCRETE PAD

3-2

The concrete pad should be level, and a minimum of 3000 PSI concrete,

steel reinforced, 150mm thick. Anchor baler to floor using anchor brackets

on sides of baler base. Two 18mm diameter anchor bolts required, Red

Head type recommended.

1. Roll baler to the desired location.

2. Unbolt the Anchor Bracket from the baler.

(both sides)

3. Turn the Anchor Brackets over and re-bolt

them to the baler.

4. Anchor the Anchor Bracket to the floor.

(both sides)

ANCHOR BRACKET IN
SHIPPING POSITION

TURN ANCHOR BRACKET
OVE AND ANCHOR TO
FLOOR