Chapter 2 system overview – MITSUBISHI ELECTRIC ETH-1000 User Manual

Page 6

Advertising
background image

2-1

Chapter 2

System Overview

A Verification System is used as a test bed for verifying the steps documented in this Quick Start guide. The
Verification System is shown in Figure 2 below with the IP address assignments of all the devices.

Netgear Switch

Monitoring Laptop 2

192.168.1.5

ControlLogix

192.168.1.30

ICC

192.168.1.102

iQ (Built-in Ethernet Port)

192.168.1.40

iQ E71 Ethernet Module

192.168.1.45

iQ System

Figure 2 Architecture of an Example Verification System

The Verification System consists of one monitoring PC (e.g. Monitoring Laptop 1), a ControlLogix system, an
ICC ETH-1000 module, and one Mitsubishi Q13UDEH PLC system.

The following list contains high-level steps to establish proper EtherNet/IP communication of this Verification
System. Each of these steps will be further detailed in subsequent chapters

1. Connect the programming/monitoring PC, Rockwell PLC, ICC ETH-1000, and Mitsubishi PLC system to

the Ethernet network

a. Configure all devices to have proper IP addresses and subnet masks as shown above.

b. Ensure that RSLogix5000, ICC Gateway Configuration Utility, and Mitsubishi GX Works2 or GX

Developer software packages are installed on the programming PC.

2. Create a project using the RSLogix5000 software to interface with the Mitsubishi PLC.

a. Add the ICC ETH-1000 as a Generic Ethernet Module in the RSLogix5000 project.

3. Configure ICC ETH-1000

a. Configure EtherNet/IP Parameters

b. Map the ControlLogix Tags for the ETH-1000 to the internal ETH-1000 database locations

c. Map ICC ETH-1000 internal database locations to proper controller register and/or bit locations

for the PLC.

4. Configure iQ system

a. Configure the Built-in Ethernet port on the iQ CPU

b. Configure the Ethernet port on an external Q71E71 module if necessary

Advertising