Remote installation, Removing the remote, Speed-up / slow-down indicator installation – Magnadyne Universal Watertight Marine Radio Controller with Speed Indicators MRC-2U User Manual

Page 5

Advertising
background image

5

Remote Installation

Inserting Strap:

Insert strap through the remote holder with tabs
facing outward.

Removing the Remote

Removing the Remote from Holder:

Press the release tab and slide out the remote.
To reinstall, slide the remote into the holder until
it snaps into place.

Release Tab

Connecting Strap:

Pull strap until the holes line up with the corre-
sponding tabs to reach desired tension.

Speed-Up / Slow-Down Indicator Installation

5

/

16”

Hole

1. Find a desired location that is clearly visible to

the driver.

2. Before installing the speed indicators, verify that

there are no obstructions behind the location
that could be damaged during installation.

3. Drill a 5/16” hole in the desired locations.

4. Feed the connector of the indicator cable through

the hole until the LED is securely fastened.

5. Remove the backing from the indicator cover and

attach the cover to the corresponding indicator.

Green Indicator = Speed-Up

Red Indicator = Slow-Down

Advertising