1. safety equipment, 2. sequence of operation, 1. routine maintenance 3 months – Miller Electric A1D-4RV User Manual

Page 12: 6 months, 3 months

Advertising
background image

OM-1580 Page 8

SECTION 4 – OPERATION

4-1.

Safety Equipment

Wear the following while welding:

1

Dry, Insulating Gloves

2

Safety Glasses With Side
Shields

3

Welding Helmet With Correct
Shade Of Filter (See ANSI
Z49.1)

sb3.1 1/94

1

2

3

4-2.

Sequence Of Operation

Install &

Connect

Equipment

Thread & Feed

Welding Wire

Put On

Personal Safety

Equipment

Turn On

Shielding Gas

Turn On Robot

Control And Welding

Run A

Welding

Program

Power Source

SECTION 5 – MAINTENANCE AND TROUBLESHOOTING

5-1.

Routine Maintenance

3 Months

OR

Blow Out

Or

Vacuum

Unit

Replace

Unreadable

Labels

6 Months

Clean

Drive

Rolls

3-1

Clean

And

Tighten

Weld

Terminals

3-2

3 Months

– –

See

Section

7

Tape Or

Replace
Cracked

Weld

Cable

– –

Cord

Gas Hose

Gun Cable

– –

Replace
Cracked

Parts

During Heavy Service,

Clean Monthly

Turn Off all power before maintaining.

Advertising
This manual is related to the following products: