Installation

y Rack Mounting

The switch can be mounted in an EIA standard 19-inch rack,

which can be placed in a wiring closet with other equipment.

Attach the mounting brackets at the switch’s front panel (one on

each side), and secure them with the provided screws. Then, use

screws provided with the equipment rack to mount each switch in

the rack.

y Connecting your network

The switch provides up to 24 ports for 10/100BaseTX. Just

connect each station to the switch by twisted-pair cable. Plug one

RJ-45 connector into a RJ-45 port of the switch, and plug the

other RJ-45 connector into the station’s network adapter. Power

on the switch and then system is ready.

In making a switch interconnection, you could use any port to

connect another switch with straight or crossover cable.

For cable selection, refer to the following table:

Network

Speed

Connector

Cable Type

Max.

Length

10BaseT

RJ-45

Cat. 3, 4, 5

UTP/STP

100 m

100BaseTX

RJ-45

Cat. 5 UTP/STP

100 m

Note: To prevent costly equipment damage and downtime, please

consider installing a surge suppression device or a UPS

(Un-interrupted Power Supply).