11. positioning jumper links – Miller Electric OM-230 User Manual
Page 21
.
A complete Parts List is available at www.MillerWelds.com
OM-230 693 Page 17
4-10. Installing Wire Spool And Adjusting Hub Tension
When a slight force is needed
to turn spool, tension is set.
15/16 in
Use compression spring
with 8 in (200 mm) spools.
Tools Needed:
072573-B / 802 922
Installing 1 Or 2 lb Wire Spool
To install either a 1 lb or 2 lb wire
spool, follow the procedure as
shown in the illustration.
Remove these
components
from spindle.
Spindle
Spindle
Install these
components
onto spindle.
Order extra spring
Part No. 186 437
4-11. Positioning Jumper Links
Tools Needed:
3/8 in
Check input voltage available at
site.
1
Jumper Links Access Door
Open door.
2
Jumper Link Label
Check label − only one is on unit.
3
Input Voltage Jumper Links
Move jumper links to match input
voltage.
Close and secure access door.
153 980-D / 144 916-E / 804 911-A
2
200 VOLTS
230 VOLTS
153 980−D
230 VOLTS 460 VOLTS 575 VOLTS
144 916−E
3
1