11. positioning jumper links – Miller Electric OM-230 User Manual

Page 21

Advertising
background image

.

A complete Parts List is available at www.MillerWelds.com

OM-230 693 Page 17

4-10. Installing Wire Spool And Adjusting Hub Tension

When a slight force is needed
to turn spool, tension is set.

15/16 in

Use compression spring
with 8 in (200 mm) spools.

Tools Needed:

072573-B / 802 922

Installing 1 Or 2 lb Wire Spool

To install either a 1 lb or 2 lb wire
spool, follow the procedure as
shown in the illustration.

Remove these

components

from spindle.

Spindle

Spindle

Install these

components

onto spindle.

Order extra spring

Part No. 186 437

4-11. Positioning Jumper Links

Tools Needed:

3/8 in

Check input voltage available at
site.

1

Jumper Links Access Door

Open door.

2

Jumper Link Label

Check label − only one is on unit.

3

Input Voltage Jumper Links

Move jumper links to match input
voltage.

Close and secure access door.

153 980-D / 144 916-E / 804 911-A

2

200 VOLTS

230 VOLTS

153 980−D

230 VOLTS 460 VOLTS 575 VOLTS

144 916−E

3

1

Advertising