Preseason instructions, Assembly instructions continued – Masterbuilt 20070910 User Manual

Page 8

Advertising
background image

8

7

SOME PARTS NOT SHOWN FOR
CLARITY

.

Step 7

Slide cooking racks onto guides
inside smoker.

Step 8

Slide brackets on back of grease
tray onto tabs on back of smoker
body until grease tray stops.

SMOKER IS READY TO USE

ASSEMBLY INSTRUCTIONS Continued

SOME PARTS NOT SHOWN FOR
CLARITY

.

Step 6

Place water bowl onto lower bracket
inside smoker.

Place drip tray inside smoker below
heating element as shown.

Note: Water bowl must always be in
place during smoking process, even
if there is no water or other liquid in
bowl. Bowl will prevent food from
dripping onto wood chips.

SOME PARTS NOT SHOWN FOR
CLARITY

.

Step 5

Place wood chip holder in smoker as
shown.

Note: Wood chip holder and wood
chip loader MUST be in place when
using smoker. This minimizes the
chance of wood flare ups.

PRESEASON INSTRUCTIONS

Preseason smoker prior to first use. Make sure water pan is in place with NO WATER. Set
temperature to 275°F (135°C) and run unit for 3 hours. Shut down and allow to cool. Some smoke
may appear during this time, this is normal.
During last 45 minutes, add 1 cup of wood chips in chip loader to complete preseasoning.

ASSEMBLY INSTRUCTIONS Continued

Advertising
This manual is related to the following products: