5. Place the flashing over the pipe section(s) extending through the roof. Secure the base of the

flashing to the roof and framing with roofing nails. Be sure roofing material overlaps the top
edge of the flashing. There must be a 1" clearance from the vent pipe to combustible materi-
als.

6. Continue to add pipe sections until the height of the vent cap meets the minimum requirements

below.

NOTE: You must increase vent height for steep roof pitches. Nearby trees, adjoining roof lines,
steep pitched roofs, and other similar factors may cause poor draft or down-drafting in high winds.
Increasing the vent height may solve this problem.
NOTE: If the vent pipe passes through any occupied areas above the first floor, including
storage spaces and closets, you must enclose pipe. You may frame and sheetrock the enclosure
with standard construction material. Make sure to meet the minimum allowable clearances to
combustibles. Do not fill any of the required clearance spaces with insulation.

ROOF PITCH

H (feet)

Flat to 6/1

1.0

Over 6/1 to 7/1

1.5

Over 7/1 to 8/1

1.5

Over 8/1 to 9/1

.0

Over 9/1 to 10/1

.5

Over 10/1 to 11/1

3.5

Over 11/1 to 1/1

4.0

*H = Minimum height from roof to lowest

discharge oopening of vent.

INSTALLATION FOR VERTICAL TERMINATION - FLAT CEILING INSTALLATION (continued)

2 ft.

Min.

2 ft. Min.

X

12

H*

FP1971

Min chimney clearance

FP1971

Figure 35 -
Minimum Chimney Clearance

Horizontal Overhang

Vertical Wall

Termination
Vent

Storm Collar

Flashing

Concentric
Vent Pipe

1" Minimum Clearance to
Combustibles

Lowest
Discharge
Opening

Advertising