Installation instructions, Dimensions, How to order – Murphy TSB User Manual

Page 2: Mounting, Wiring, R230, Warranty

Advertising
background image

TSB-9137B page 2 of 2

4-11/64 in.

(106 mm)

2-1/32 in.
Diameter
(52 mm)

5/8-18 UNF-2A

1/4 in. Dia.

(6 mm)

1/2-14 NPT
(standard)

1-9/32 in.

(33 mm)

2-1/4 in.

(57 mm)

NO C NC

Slot head terminal

screws (4-40, UNC-2A)

Dimensions

To order the TSB model use the diagram below.

TSB

R230

3/8

Connection Size

Standard Switch Trip Point

Specify trip point value. Example: TSB-R200

Standard Switch Trip Point

Values (rising)*

R165 = 165°F (74°C)
R180 = 180°F (82°C)
R200 = 200°F (93°C)
R205 = 205°F (96°C)
R210 = 210°F (99°C)
R220 = 220°F (104°C)
R225 = 225°F (107°C)
R230 = 230°F (110°C)
R240 = 240°F (116°C)
R250 = 250°F (121°C)

*

Non standard trip points require a minimum quantity order.

Trip point must be in 5°F increments between 165– 250°F (74–121°C).

Switch Reset Differential ±15°F (±8.3°C)
Switch Repeatability

±3°F (1.7°C)

How to Order

** Standard connection.

Includes copper seal.

Blank = 1/2-14 NPT

**

10-05-0131

**

1/4 = 1/4-18 NPT

10-05-0167

3/8 = 3/8-18 NPT

10-05-0069

5/8 = 5/8-18 UNF

10-05-0068

3/4 = 3/4-14 NPT

10-05-0105

7/8 = 7/8-9 UNC

10-05-0093

3/8B = 3/8-19 BSPT

10-05-0284

1/2B = 1/2 BSPT

10-05-0330

M14 = 14 mm x 1.5

10-05-0104

M16 = 16 mm x 1.5

10-05-0514

M18 = 18 mm x 1.5

10-05-0399

M20 = 20 mm x 1.5

10-05-0670

M22 = 22 mm x 1.5

10-05-0606

M24 = 24 mm x 1.5

10-05-0907

Installation Instructions

Mounting

1. The TSB can be mounted in horizontal or vertical angles (do not

mount the switch facing down).

2. Install the TSB switch in the engine water jacket location

recommended by the engine manufacturer.

3. Install the appropriate adapter nut into the engine water jacket. Use

thread sealant such as Teflon

®

tape as necessary.

4. Insert the sensing bulb through the adapter nut. The sensing bulb

must be fully immersed in coolant/liquid flow so liquid flows
across the sensing bulb.

5. Tighten the 5/8-18 UNF-2A compression nut to complete a liquid

tight seal.

Wiring

CAUTION: DISCONNECT Electrical
Power before wiring.
1. See wiring schematic below.

Switch contacts are shown with no
temperature applied to the
TSB switch.

2. A spade (forked) terminal

is recommended for all TSB
switch connections.

3. Complete the wiring operation

making sure the voltage and current requirements are within the
TSB switch electrical rating.

WRONG

UP

M

ou

nt

in

g A

ngl

e

Normally

Closed (N.C.)

Normally

Open (N.O.)

Common (C)

Teflon is a trademark of Dupont.

Warranty

A limited warranty on materials and workmanship is given with this FW
Murphy product. A copy of the warranty may be viewed or printed by going to
www.fwmurphy.com/support/warranty.htm

Printed in U.S.A.

10 91 181

In order to consistently bring you the highest quality, full featured products, we reserve the right to change
our specifications and designs at any time. MURPHY, the Murphy logo are registered and/or common law
trademarks of Murphy Industries, Inc. This document, including textual matter and illustrations, is copyright
protected by Murphy Industries, Inc., with all rights reserved. (c) 2006 Murphy Industries, Inc.

www.fwmurphy.com

918.317.4100 Email: [email protected]

Accuracy

165– 210°F ±5°F (±2.7°C)
Water/glycol 10% used for
setpoint

215– 230°F ±7°F (±3.8°C)
240– 250°F ±10°F (±6.5°C)
Heat transfer fluid used for
setpoint (276 viscosity @ 100°F)

Advertising