Getting started, Location, Preliminary checks – MGE UPS Systems EXB10 User Manual

Page 12: Connections

Advertising
background image

12

Pulsar EX: E-51032233XT/AC

MGE UPS SYSTEMS

8

0V

ng

I max 8.3A

Vac

OUT

7

?

ess

re

s

to computer
loads

getting started

location

c

observe the safety rules indicated at the

beginning of this document.

preliminary checks

c

check that the "on/off" button "

" on the

front is not pushed in;

c

check that rating shown on the rating label

corresponds to the input voltage
specification and power requirement of the
load.

connections

c

use the AC input cord to supply input

power to Pulsar as shown.
Connect the AC input cord between UPS
utility power input receptacle, and utility
power outlet.

c

connect the computer loads to output

sockets 7 .

Note 1: following connection, the battery
automatically charges, whenever plugged in.

Note 2: the batteries will provide full back-up
time after approximatively 8 hours of
recharge time.

Note 3: the rating of input power cord must
be not less than the nominal input rating of
Pulsar EX: use the supplied cord.

Note 4: if site wiring fault LED 8 is lit and
buzzer sounds, line/neutral connections are
reversed.

c

connection of the Pulsar EXB10/EXB15

battery extension module (optional):

v

check that the button "on/off" "

" on the

front of the Pulsar EX10/EX15 is not pushed
in,

v

disconnect the input connection cord,

v

flip the circuit-breaker of the battery unit to

the right (position "O"),

v

connect the battery connection cord to the

DC connector of the battery module and
connect to the Pulsar EX10/EX15,

v

if the installation has 2 battery modules,

connect the second cord to the DC
connector of the second module and to the
first module,

v

the use of connectors is strictly limited to

connecting the battery modules to the
Pulsar EX10/EX15. Any other connection to
these connectors is prohibited and risks
damaging the battery, not covered by
warranty,

v

to start, flip the battery circuit-breaker to

the left (position "I"),

v

if your installation is operated with MGE

UPS SYSTEMS software, update your
battery configuration with EX Tuner.

T 15A

125V

Vac IN

I max 8.3A

?

pr

ess

re

set

4

utility power
receptacle

Advertising
This manual is related to the following products: