9.2 Tools for Site Adjustment

You will need the following equipment and reference material in order to easily carry out site adjustment.

Item Contents

Note

Measurement
instruments

Tester

To check the wiring and the voltage

Reference
material

All necessary drawing of the air
conditioning control system

BACnet IF Operation Manual

This manual

Instruction Manual and Installation Manual
for each air conditioner unit and controller

Other
material

Floppy disk

Used when copying data

CD-R

Used to store generated data and copy it to
the site PC

BACnet IF CD

BACnet IF setup disk

LAN

cable

usual

maintenance

tool


9.3 Step 1: Test operation from centralized controller G-50A


Perform only the test operation of the air-conditioning system of the central controller G-50A.


Ether BACnet

Building Automation System

BACnet IF

G-50A

Step 1

Power

supply unit

HUB

LAN















(1) Preliminary check

Check that the test operation of the air conditioner has been completed.
Check that the central controller G-50A is set to Group and Interlock.
(The initial setting is executable using the initial setting tool or the G-50A.)

(2) Test operation from central controller G-50A

After supplying power to the central controller G-50A and all air conditioners, perform the test
operation from the central controller G-50A, and check the operation state of each unit.
* For the test operation method, refer to the installation manual for the air conditioner or the central

controller G-50A.