Solenoid wire rod processing, Switch board assembly specification, Speaker installation and line processing – Matsushita CF-W4GWCZZ User Manual

Page 25

Advertising
background image

3.4. Solenoid Wire Rod processing

Solenoid with cable

Inserts under the rib

Disk Cover Lock

Inserts between ribs

Up that there is no screw hole

The Solenoid with the cable is made
on the Disk Cover Lock

Solenoid Cable

3.5. Switch Board assembly specification

SW Board FFC

SW Board

Disk Eject Knob

Screw

Tape

To confirms that the Lever of the switch has been
surely inserted in the ditch of the knob

Central suiting
with the pin

0

1mm

0

1mm

0

1mm

Terminal Side

Fold as valley type

Suiting with shape of case

Suiting with

shape of board

SW Board FFC

Connection to SW Board

Affixation of PET Tape

Pin

3.6. Speaker installation and Line processing

Affixation of Speaker Ring

Put it according to the shape of the rib.
Note not running aground in the rib.

Speaker Cable

Speaker

Soldering

Soldering

Black Line

Red Line

Soldering of Speaker Cable

Speaker Ring

Rib

Rib

3-5

Advertising