Mini he, Introduction, Safety – IDEAL INDUSTRIES MINI HE C28 User Manual

Page 2: Electricity supply, Minimum clearances, Boiler controls, Diagnostic lights

Advertising
background image

mini HE

mini HE C24

G.C. appliance No. 47---348---38

mini HE C28

G.C. appliance No. 47---348---39

Destination countries: GB, IE

INTRODUCTION

mini HE are wall mounted, room sealed, condensing, low

water content combination gas boilers featuring full sequence

automatic spark ignition and fan assisted combustion.

SAFETY

Current Gas Safety (Installation & Use)

Regulations or rules in force
In your own interest, and that of safety, it is the law that this boiler

must be installed by a CORGI registered installer or in IE a

competent person, in accordance with the above regulations.
It is essential that the instructions in this booklet are strictly

followed, for safe and economical operation of the boiler.

ELECTRICITY SUPPLY

The appliance must be efficiently earthed.
Supply 230 V 50 Hz. The fusing should be 3 A.
Connection must be made in a way that allows complete

isolation of the electrical supply, such as a double pole switch,

having a 3 mm (1/8”) contact separation in both poles, or a

plug and socket serving only the boiler and system controls.

The means of isolation must be accessible to the user after

installation.

IMPORTANT NOTES

F

This appliance must not be operated without the casing

correctly fitted and forming an adequate seal.

F

If the boiler is installed in a compartment then the

compartment MUST NOT be used for storage purposes.

F

Under no circumstances should any of the sealed

components on this appliance be used incorrectly or

tampered with.

F

If it is known or suspected that a fault exist on the boiler

then it MUST NOT BE USED until the fault has been

corrected by a CORGI registered installer or in IE a

competent person.

MINIMUM CLEARANCES

Clearances of 200 mm (7 7/8“) above and below, 25 mm (1“)

at left, 50 mm (2“) at right and 450 mm (17 3/4“) at the front of

the boiler case must be allowed for servicing.

After installation the following clearances are allowable during

use, providing the encasing parts are removeable for servicing:

The bottom clearance can be reduced to 20mm (3/4”).

The front clearance can be reduced to 50mm (2”).

BOILER CONTROLS

B

C

D

E

F

G

A

A Appliance operation lights
B Domestic hot water temperature control
C Main switch and radiator temperature control
D Boiler reset button
E Lock---out signal lamp
F Programmer (optional)
G System pressure and temperature gauge

TO LIGHT THE BOILER

1 Check that the valves located in the lower part of the boiler

are open.

2 Switch the electricity supply on.

The appliance operation light A will flash every 4 seconds

(stand---by condition).

3 If the boiler is to be used for CH and DHW position the

main switch as in the following illustration.

The appliance operation light A will flash every 2 seconds

(operating boiler).

C

A

DIAGNOSTIC LIGHTS

The following table gives a summary of the relationship

between each of the possible light combinations and their

meaning during normal operaion of the boiler

THE BENCHMARK SERVICE INTERVAL RECORD MUST BE COMPLETED AFTER EACH SERVICE

Caradon Ideal Limited is a member of the Benchmark initiative and fully supports the

aims of the programme. Benchmark has been introduced to improve the standards of

installation and commissioning of central heating systems in the UK and to encourage

the regular servicing of all central heating systems to ensure safety and efficiency.

All CORGI registered installers carry a CORGI ID card, and have a registration number. Both should be recorded in the

Benchmark

Commissioning Checklist. You can check your installer by calling CORGI direct on 01256 372300.

Advertising
This manual is related to the following products: