Assembly – Image IMSB61610 User Manual

Page 8

Advertising
background image

8

Before beginning assembly, carefully read the
following information and instructions:

• Place all parts in a cleared area and remove the

packing materials from the spa shell. Do not dis-
pose of the packing materials until assembly is
completed and the spa is operating.

• During assembly, make sure that all parts are

oriented as shown in the drawings.

• Read each assembly step before you begin.

• Tighten all parts as you assemble them, unless

instructed to do otherwise.

ASSEMBLY REQUIRES THE FOLLOWING
TOOLS (not included):

• One (1) phillips screwdriver

• You may also need a small amount of soapy

water.

A wire connector is provided on the electronics
pack of the spa to connect a minimum No. 6
AWG (13.03 mm

2

) solid copper conductor

between the spa and any metal equipment,
electrical enclosure made of metal, metal water
pipes, or conduit within five feet of the spa.

1. Before beginning assembly, make sure that you

have read and understand the information in the
box above and on the previous two pages.

Remove the four indicated #10 x 2” Sheet Metal
Screws (7). Remove the Access Panel (2) by sliding
it down and then pulling the bottom away from the
spa. Be careful not to damage the spa shell.

Assembly

Collars

Collar

Collar

7

7

2

1

2

Spa Shell

Gate Valve

Stem

Locking

Clip

Gate

Valve

Drain

Hose

Valve

Knob

Cap

2. Locate the drain hose inside of the spa. Close the

valve knob on top of the drain hose. Make sure that
the cap is fully tightened onto the end of the drain
hose.

Locate the two indicated gate valves inside of the
spa. Make sure that the gate valves are open and
that the locking clips are snapped onto the stems of
the gate valves. In addition, make sure that the four
indicated collars are tight.

See step 1. Re-attach the Access Panel (2) with the
four #10 x 2” Sheet Metal Screws (7).

Advertising
This manual is related to the following products: