Diagram 8 – Impex IGS 16 User Manual

Page 15

Advertising
background image


STEP 8 (See Diagram 8)

A.) Insert the Right Butterfly Arm (#6) into the pivot on the Front Vertical Beam (#3). Secure it

with one M10 x ¾” Allen Bolt (#97), Ø ¾” Spring Washer (#115), and Ø 1 ½” x Ø ½”
Washer (#122).

B.) Insert the Butterfly Swivel Handle (#8) into the pivot tube on the Right Butterfly Arm (#6).

Secure the bottom with a Ø 1” Clip Ring (#94).

C.) Repeat the above steps to install the other side.

DIAGRAM 8





14


Advertising