Before starting up, Starting up – IDEAL INDUSTRIES Heat Gun User Manual
Page 5
Advertising
5
OPERATION CONDITION
Before starting up
• As required, push-fit appropriate adapter.
• If using an extension cord, it must be at least 14 gauge.
• The voltage rating stated on the tool should correspond to the main power voltage.
• Power cord and plug must be in perfect condition.
Starting up
Connect tool to main power supply.
Step-switch position
0 :
Tool is switched off
Step-switch position
I :
Tool heats to 660°F. Reduced air flow
Step-switch position
II :
Tool heats to 930°F. Maximum air flow
Step 0
Step I
Step II
USA
Advertising