Before starting up, Starting up – IDEAL INDUSTRIES Heat Gun User Manual

Page 5

Advertising
background image

5

OPERATION CONDITION

Before starting up

• As required, push-fit appropriate adapter.
• If using an extension cord, it must be at least 14 gauge.
• The voltage rating stated on the tool should correspond to the main power voltage.
• Power cord and plug must be in perfect condition.

Starting up

Connect tool to main power supply.

Step-switch position

0 :

Tool is switched off

Step-switch position

I :

Tool heats to 660°F. Reduced air flow

Step-switch position

II :

Tool heats to 930°F. Maximum air flow

Step 0

Step I

Step II

USA

Advertising