Diagram 5 – Impex MCB-849 User Manual

Page 11

Advertising
background image

STEP 5

(See Diagram 5)

A.) Attach two Ø 5/8” Bushings (#20) to the Leg Developer (#10). Attach the Leg Developer

to the Leg Developer Holder (#7). Secure it with one M10 x 3 1/8” Allen Bolt (#36), two Ø
¾” Washers (#41), and one M10 Aircraft Nut (#44).

B.) Insert three Foam Tubes (#13) halfway through the holes on the Leg Developer and Leg

Developer Holder. Push six Foam Rolls (#27) onto the Tubes from both ends. Plug six
Foam Roll End Caps (#26) into the ends.

C.) Slide an Olympic Sleeve (#29) onto the weight post on Leg Developer. Attach a Spring

Clip (#30) onto the Sleeve.

D.) Thread a M10 Lock Knob into Leg Developer Holder.

DIAGRAM 5








10

Advertising