Building in, Building over a cupboard or – John Lewis JLBIGH753 User Manual

Page 14

Advertising
background image

14

IMPORTANT:

IMPORTANT:

IMPORTANT:

IMPORTANT:

IMPORTANT:

This hob must be

installed according to the instruction
supplied, and by qualified and

qualified and

qualified and

qualified and

qualified and

competent personnel

competent personnel

competent personnel

competent personnel

competent personnel to the relevant
National Standards.

Please ensure that when the hob is
installed it is easily accessible for the
engineer in the event of breakdown.

Building over a cupboard or

Building over a cupboard or

Building over a cupboard or

Building over a cupboard or

Building over a cupboard or

dra

dra

dra

dra

draw

w

w

w

wer

er

er

er

er

If the hob is to be installed above a cupboard
or drawer it will be necessary to fit a heat
resistant board below the base of the hob on
the underside of the work surface.

It is also recommended to carry out the
electrical connection to the hob as shown in
diagrams 1 and 2.

Building in

Building in

Building in

Building in

Building in

ON/OFF SWITCH

FLEX
OUTLET

1

ON/OFF SWITCH

FLEX
OUTLET

2

Advertising