Jumpking Orbounder 12ft Combo YJ User Manual

Page 18

Advertising
background image

10. Attach the other three Pole(16,17) in the same way.
See inset drawing.

10





19







11. Lay out Top G3 Pole (18), joint each section
Connector to a straight line as shown.

Assemble the remaining Top G3 Pole (18) in the
same way.

Spread the Netting (20) on the trampoline bed,
insert a Top G3 Pole (18) into the opening of
Top Sleeve on the Netting (20). Insert the
other Top G3 Pole (18) into the opposite
opening of Top Sleeve on the Netting (20).



,QVHUWWKHSROHLQWRVOHHYHRIWKH1HWWLQJ 

D

1HWWLQJ 



2SHQLQJ





-RLQWWKHHQGRIHDFKSROHE\&OLSRI&RQQHFWRU

6WDUW

)LQLVK



'RRURI1HWWLQJ

7RS6OHHYH



12. Joint each end of Top G3 Pole (18) by the clip of
connector at each opening. The Top Sleeve of the
Netting (20) become a round shape.



Advertising