Side burner – Jackson 700 Series User Manual

Page 18

Advertising
background image

SIDE BURNER

Open the Side

id and

the

Grate above the

ead.

Burner L
Remove

1

Open the side burner lid and remove the grate over
the burner head.

2

Undo the 2 Phillips head screws that hold the Flame

away from the burner Head.

3

Undo the 3 screws that hold the Burner Head onto

in orifices and place away from the

Natural Gas conversion kit so the orifices will not get

ace the 2 orifices using an approved thread

sealant.

7

Reinstall the Flame Thrower ensuring that the tip is

r Head.

OTE:

Burner h

Thrower (burner ignition) and VERY Carefully move

the Side Shelf base.

4

Remove the 2 ma

mixed up with the new orifices.

5

Repl

6

Reinstall the Burner head using the 3 screws
previously removed.

properly placed inside the bottom of the Burne

Burner Head
screws X 3

Carefully move the Flame Thrower


Flame

(Burner ignition) away from the
Burner Head.

Thrower
screws X 2




Undo the 3 screws that hold the Burner Head to the
base plate and carefully move Burner Head off of
the 2 Side Burner orifices

Remove the 2 orifices from the Side
Burner Valve and replace with the
new Natural gas Orifices supplied in
the Natural gas conversion kit



N

These 2 orifices look the same. The smaller size orifice is to be installed in the center outlet of the

ide Burner Gas Valve. And the larger orifice is to be installed on the right hand outlet of the Gas Valve.

S

18

Advertising