Johnson Controls CM8M/CMLM*MP User Manual

Page 5

Advertising
background image

368261-UIM-A-0508

Johnson Controls Unitary Products

5

DUCT FLANGES

Four flanges are provided to attach ductwork to the furnace. These
flanges are rotated down for shipment. In order to use the flanges,
remove the screw holding an individual flange, rotate the flange so it is
in the upward position and reinstall the screw then repeat this for all 4
flanges.

If the flanges are not used, they should remain in the rotated down posi-
tion as shipped.

DUCTWORK INSTALLATION AND SUPPLY PLENUM

CONNECTION - UPFLOW/HORIZONTAL

Attach the supply plenum to the furnace outlet. The use of
an approved flexible duct connector is recommended on all
installations. This connection should be sealed to prevent
air leakage. The sheet metal should be crosshatched to
eliminate any popping of the sheet metal when the indoor
fan is energized.

FLOOR BASE AND DUCTWORK INSTALLATION -

DOWNFLOW

Installations on combustible material or directly on any
floors must use a combustible floor base shown in Figure 8,
"Combustible Floor Base Accessory". Follow the instruc-
tions supplied with the combustible floor base accessory.
This combustible floor base can be replaced with a match-
ing cooling coil, properly sealed to prevent leaks. Follow the
instructions supplied with the cooling coil cabinet for install-
ing the cabinet to the duct connector. Plug intake and vent
pipe holes in bottom panel and move grommet to desired
vent side exit.

Downflow Air Conditioning Coil Cabinet

The furnace should be installed with coil cabinet part number specifi-
cally intended for downflow application. If a matching cooling coil is
used, it may be placed directly on the furnace outlet and sealed to pre-
vent leakage. For details of the coil cabinet dimensions and installation
requirements, refer to the installation instructions supplied with the coil
cabinet.

Attach the air conditioning coil cabinet to the duct connector, and then
position the furnace on top of the coil cabinet. The connection to the fur-
nace, air conditioning coil cabinet, duct connector, and supply air duct
must be sealed to prevent air leakage.

COIL INSTALLATION

COIL/FURNACE ASSEMBLY - MC/FC/PC SERIES

COILS

FURNACE ASSEMBLY - MC & FC SERIES COILS

These coils are factory shipped for installation in either upflow or down-
flow applications with no conversion.

Position the coil casing over or under the furnace opening as shown in
Figure 2, "Vertical Applications" after configuring coil flanges as
required see “Coil Flange” section below.

COIL FLANGE INSTALLATION

The coils include removable flanges to allow proper fit up with furnaces
having various inlet and outlet flange configurations. The two flanges
are attached to the top of the coil in the factory during production. For
proper configuration of flanges refer to Figure 3, "Coil Flange".

FURNACE ASSEMBLY - MC SERIES COILS ONLY

MC coils are supplied ready to be installed in a horizontal position. A
horizontal pan is factory installed. MC coils should be installed in all hor-
izontal applications with the horizontal drain pan side down.

FIGURE 1: Duct Attachment

On all installations without a coil, a removable access panel is rec-
ommended in the outlet duct such that smoke or reflected light
would be observable inside the casing to indicate the presence of
leaks in the heat exchanger. This access cover shall be attached in
such a manner as to prevent leaks.

Factory
installed

For duct attachment,
if needed.

FIGURE 2: Vertical Applications

FIGURE 3: Coil Flange

FIGURE 4: Horizontal Right Application

UPFLOW

DOWNFLOW

Furnace

Furnace

ALTERNATE
FLANGE LOCATION
(Used for downflow or
horizontal left installations)

FACTORY

FLANGE

LOCATION

(Used for upflow

or horizontal

right installations)

Furnace

Mounting Plate

Advertising
This manual is related to the following products: