Preparation procedure, Step 1 connection/installation, Step 2 network settings – JVC VN-C655 User Manual

Page 12: Step 5 operating using a web browser

Advertising
background image

12

Set the camera in the following procedure.

Preparation Procedure

Step 1 Connection/Installation

Firstly, make a hole in the ceiling, followed by connecting the power cable, LAN
cable or alarm signal cable to the terminal of the ceiling mount of this camera.
Next, attach the camera to the ceiling. Do not forget to attach the safety wire.

Step 2 Network Settings

Install the software, set the network for this camera as well as using the "VN-
C655U Setup Tool", and register the connected camera with the "V.Networks
Controller".

Step 3 Setting Using the V.Networks Controller

Perform settings for Auto Pan, Auto Patrol, Auto Trace, Image Quality and Alarm
using the "V. Networks Controller" software that has been installed.

Step 4 Operating Using the V.Networks Controller

The "V. Networks Controller" can also be used to perform recording/playback operations.

For details, refer to the PDF instruction manual inside the supplied CD-ROM.

Page 13

Page 22

Page 29

● In a system where more than 1 VN-C655 is used, turn on the power for a VN-C655

first, followed by setting the camera until "2-3 Setting IP Address for this Camera
Using the 'VN-C655U Setup Tool' " is completed. Upon doing so, turn on a second
camera and perform setting in the same way. Perform the same procedure for
subsequent cameras.
(

Page 17)

Step 5 Operating Using a Web Browser

Operation is possible via a web browser.

Page 32

Preparation

VN-C655(B)_0202_p2-21

05.3.16, 6:24 PM

12

Advertising