SIIG 04-0529D User Manual

Page 3

Advertising
background image

Note:

Step 1: Wall plate installation

1

3

4

You should mark four positions total.

5

6

7

8

CAUTION:

CAUTION:

Mark the right (upper and lower) and the left (upper and lower)
positions of the small horizontal slots that are in alignment with
the studs.

Position the wall plate against the wall and line up the mounting
slots with the drilled holes. Check the bubble level to verify that
the wall plate is level.

For each location, insert a lag bolt (J) and washer (L-1) into the
wall (figure 1-c).

A) Wood Stud Installation

1. Please ensure that the bubble level (L-2) is properly attached to the
wall plate prior to mounting.

Use a high-quality electronic stud finder (commercially available)
to locate two adjacent studs and mark their locations with a
pencil (1-a).

Tighten each bolt with an open ended socket wrench by turning clockwise until tight.

Do not release the wall plate until it is properly mounted and secured to the wall.

NOTE: For secure wood stud mounting, the wall plate must be mounted to two studs at least
16" apart.

2

2. Please check the two rails before installing, if without the
knob, please detach the screw and install the knob.

Do not over-tighten bolts-doing so many cause unnecessary damage to the wall. Avoid excessive
torque.

Pre-drill a /16" hole to a depth of 3" in the wall stud at each
marked location.

Attach the bubble level (L-2) to the wall plate and with the help of
an assistant ensure the wall plate is level, position the wall plate
against the wall in the desired mounting location (figure 1-b).

3

Advertising