Quick setup list – Snapper 520 Series User Manual

Page 3

Advertising
background image

Quick Setup List -

520 Single Stage Snowthrower

5/2005

3

Page

Setup Procedure

Steps to Perform

4

Unbox & Assemble

❏ Remove Unit From Box.
❏ Install Discharge Chute
❏ Assemble Handle Bars

(Be careful not to pinch the auger cable)

❏ Mount Clean-Out Tool in storage position

on handle

5

Fill Gas Tank

❏ Fill Gas Tank

6

Lubricate Snowthrower

❏ Lubricate all grease & oil points

7

Test Run

❏ Check Primer
❏ Check Choke
❏ Check Recoil Starter
❏ Check Electric Starter (Where Applicable)
❏ Check Auger Control Cable
❏ Check Kill Switch
❏ Check Chute Rotator
❏ Check Deflector

Additional information concerning functional
tests, general adjustment procedures, and
the location of normal lubrication points are

included in these instructions.

Although all required lubrication and normal adjust-
ments on factory-assembled components are done at
the factory, this additional information is provided to
assist you in ensuring that each unit is delivered to the
customer in proper working order.

Advertising