Appendix d: acceptance test procedures, Isgs acceptance test – Siemens ISGS SG8158-00 User Manual

Page 71

Advertising
background image

Appendix D: Acceptance Test Procedures

Siemens Energy & Automation, Inc.

65

ISGS Acceptance Test

Neutral Time Overcurrent (51N) Function

Set the ISGS as follows:
Parameter Set A

7103

5000:5 Current Transformer (CT)

1102

Curve SEA 5, Very Inverse

1802

1 A Nominal Pickup

1803

Time Dial per Chart

1805

Trip Matrixed to Trip 1 Contact

6401

Enable 51N

1801

Disable Other Conflicting Functions

1501, 1551, 1601, 1651, 1901, 2001, 2301

Raise 51 Pickup to Maximum

1703

Phase
N

Connections
1. Connect the appropriate source of control voltage to terminals 13 (+) and 12 (-).

Relay Disabled contact on terminals 19 and 20 opens.

2. Connect suitable variable source current

to neutral, terminals 9 and 10.

3. Connect timer to Trip 1 contacts, terminals 1 and 2.

Pickup

4. Increase current until relay picks up (this should occur at 1.06 A x pickup).

Pickup LED illuminates.

Wisdom software records pickup in event log.

Return current to zero and reset timer.

Timing

5. Apply appropriate value of current for the test. The results match Table D.2.

Pickup LED illuminates.

Display shows PICKUP 51N PN.

Wisdom software records pickup in event log.

D

isv3o_1.bk : isv3otst.frm Page 65 Wednesday, August 7, 1996 10:51 AM

Advertising