English – Stiga SILEX 75R-B User Manual

Page 7

Advertising
background image

44

ENGLISH

GB

4.10Oil draining

The screw is removed when used engine oil is to be

drained.
The screw is shown according to the table below:

4.11Auxiliary wheel (1:L)

The auxiliary wheel is intended to assist transport

of the machine and has two positions.

The auxiliary wheel must be folded up dur-

ing operation – Installed in the front hole.

The auxiliary wheel must be down for

transport – Installed in the rear hole.

The auxiliary wheel is folded up and down as fol-

lows:
1. Pull out the locking pin (6:T).
2. Pull out the auxiliary wheel and stay and rein-

stall in the desired position.

3. Reinstall the locking pin.

4.12Gearbox (1:M)

The gearbox becomes extremely hot

during operation. Risk of burn injuries.

4.13Rotors (1:N)

Nobody must be close to the dangerous

rotors during operation.

The rotors are made of special steel and work the

soil at the same time as the machine is propelled

forwards. The machine can be operated with one,

two or three rotors on each side. Removal and in-

stallation of the rotors is by removing the locking

pins and screws. See fig. 8.

4.14Cutting disc (1:O).

Nobody must be close to the dangerous

cutting discs during operation.
The cutting discs are on respective rotor

axles and are designed to border the working area

and facilitate control of the machine.

4.15 Choke

The choke must never be activated dur-

ing operation. This will damage the en-

gine.

The choke must be activated at cold starts.
The choke is shown according to the table below:

4.16Fuel cock

The fuel cock should be open during operation and

closed when the machine is not used.
The fuel cock is shown according to the table be-

low:

4.17 Starting handle

Handle for starting the engine.
The starting handle is shown according to the table

below:

4.18Depth skid (1:S)

The task of the depth skid is to keep the machine

stable so that the soil can be cultivated.
The depth skid has three positions. Shifting takes

place as follows:
1. Pull out the locking pin (6:T).
2. Pull out the depth skid and reinstall in the de-

sired position.

3. Reinstall the locking pin.

Machine

Figure:Position

75-G

2:K

75R-B

1:K

75R-H

3:K

75R-HX

4:K

Machine

Figure:Position

75-G

2:P

75R-B

1:P

75R-H

3:P

75R-HX

4:P

Machine

Figure:Position

75-G

2:Q

75R-B

1:Q

75R-H

3:Q

75R-HX

4:Q

Machine

Figure:Position

75-G

2:R

75R-B

1:R

75R-H

3:R

75R-HX

4:R

Advertising
This manual is related to the following products: