SharkRack CM-74 User Manual

Page 2

Advertising
background image

CM-74 Vertical Cable Management Installation Instructions

CM-74

04/30/03 Rev 1.0

Page 2 of 3

Installation Instructions

Step

Detail

The CM-74 is a vertical cable management
rail that secures vertically run cables. The
CM-74 is mounted at the rear of the
cabinet on either side.

1. Choose a location for the vertical cable

management rail.

Note: The vertical cable management

rail can be installed on either side of the
cabinet.

2. Install the trapezoidal spring nut into the

cabinet frame. Fit the spring nut into the
cabinet slotted part of the cabinet
extrusion with the spring facing the
opening. Turn the spring nut 90 degrees
to secure it into place.(See Figure A)

3. Place the mounting hole of the vertical

cable management rail over the spring
nut.

4. Secure the vertical cable management

rail to the cabinet frame using (2) 1/4-20
cap screws. Do not tighten the screws
until the final placement is made.

5. The rail can be moved forward or

backward before the mounting screws
are tightened. Once the rail is in
positionm tighten the (2) 1/4-20 cap
screws.

Advertising