Electric checks and adjustments, Previous | home | next – SATO XL4xxe User Manual

Page 2

Advertising
background image

2

Barcode SATO International Pte Ltd

Electric Checks

and Adjustments

This explains how to check DC power supply, I-Mark
sensor level, Gap/center hole sensor level, ribbon sensor
level, side hole sensor level, R-corner hole sensor level
and jump hole sensor level. Ensure printer power is OFF.
Then remove the VR cover on the back of the printer and
perform the following steps.

Additional equipment required
TP Test Module
Digital Multimeter

STEPS

1 Attach the connector from the TP Test Module to the

test port on the MAIN PCB. Note correct positioning
of connector. Nibs on the connector are placed down
on the PCB in the forward position.

2 Attach the ground probe of the Digital Multimeter to

the TP Test Module ground pin (GND PIN).

3 Attach positive probe of the Multimeter to the +SIG

PIN on the TP Test Module terminal.

4 Turn printer power on and rotate the dial to a dial

POS on the TP Test Module. Record the values from
the Multimeter.

5 Confirm voltages are correct. If not, then replace

parts or adjustment sensor level. Refer to Check and
Adjustment chart.

6 After p erforming test, put the VR cover b ack to

the printer.

Cable to PCB

Ground PIN

SIG PIN

Dial

TP Test Module

<

previous | home | next

>

EZ Manual: XL4xxe

Cable to TP Test Module

Advertising