Initial Installation

G

AS

L

INE

C

ONNECTION

AND

T

ESTING

:

WARNING: Only persons licensed to work with gas piping may make the necessary gas connections to

this appliance.
GAS LINE CONNECTION
• This stove is equipped with a certified flexible pipe located on the right side of the unit terminating in

a 3⁄8” male NPT fitting. Consult your local authorities codes or the CAN/CGA B 149 (1 or 2) installation

code in Canada, or in the USA gas installations follow either local codes or the current edition of the

National Fuel Gas Code ANSI Z223.1.

• The efficiency rating of this appliance is a product thermal efficiency rating determined under

continuous operating conditions and was determined independently of any installed system.

The appliance and its shutoff valves must be

disconnected from the gas supply piping system

during any pressure testing where the pressure

exceeds 1⁄2 PSIG (3.45 KPa) or damage will occur

to the valve.
The appliance must be isolated from the gas supply

piping system by closing its individual manual

shutoff valve during any pressure testing of the gas

supply piping system at test pressures equal to or

less than 1⁄2 psig (3.45 KPa).

Always check for gas leaks with a soap

and water solution after completing the

required pressure test.

TO TEST VALVE PRESSURES
The pressure taps are located on the left side of the valve

• Turn set screw 1 turn counter clockwise to loosen,

• Place

5

/

16

” (8 mm) I.D. hose over pressure tap system.

• Check pressures using a manometer.

• When finished, release pressure, remove hose & tighten setscrew.

Table 7: Pressure and BTU Information.

Natural Gas

Propane

Front Burner

#48 DMS

#56 DMS

Rear Burner

#43 DMS

#54 DMS

Manifold Pressure

3.8” W.C. (0.95 KPa)

11.0” W.C. (2.7KPa)

Min. Manifold Pressure

1.1” W.C. (0.27KPa)

2.7” W.C. (0.67KPa)

Max Supply Pressure

7.0” W.C. (1.74KPa)

12.0” W.C. (2.98KPa)

Min. Supply Pressure

5.0” W.C. (1.24KPa)

11.5” W.C. (2.86KPa)

Max BTU/hr Input

38,000 BTU/hr (11.1KW)

38,000 BTU/hr (7.76KW)

Min. BTU/hr Input

20,000 BTU/hr (5.9 KW)

20,000 BTU/hr (5.9KW)

NEVER USE AN OPEN FLAME FOR LEAK TESTING.