Figure 1-7 – Sun Microsystems SERVER 1290 User Manual

Page 24

Advertising
background image

12

Netra 1290 Server Installation Guide • May 2006

a. Loosen the four nuts that secure the rear bracket.

b. Reposition the rear bracket to the location marked “NGR Cabinet” on the slide

rail assembly and secure the rear bracket.

3. Insert the pins in the front bracket into cabinet holes 22 and 33

(

FIGURE 1-7

).

FIGURE 1-7

Installing the Rails in a Sun Rack 900 Cabinet or 19-Inch Four-Post Cabinet

The pins will hold the bracket in place until the bracket is secured.

4. Secure the rear bracket into cabinet holes 24 and 31 with two M-6 UNF screws.

5. Secure the front bracket into cabinet holes 24 and 31 with two M-6 UNF screws.

6. Repeat

Step 1

through

Step 5

for the second slide rail assembly.

Note –

Mounting the server in cabinet holes 24 and 31 allows for 10-inches of space

beneath the server in order to service the backplane.

Rear bracket
secured to outer cabinet holes

Front bracket
secured to outer cabinet holes

Advertising