3 dsp resource management – Solid State Logic DUENDE 82S6MC060A User Manual

Page 11

Advertising
background image

7

4.3 DSP Resource Management

Due to the Duende having 4 DSP chips, a minimal amount of

resource management should be done when running Duende

at high load.
If there are, for example 2 slots free and you wish to load a

stereo plug-in, Duende will under certain conditions notify

you that you are out of DSP resources. This will only happen

if the two slots are on different DSP chips as Duende is not

able to load a stereo plug-in across 2 chips. This may well

occur because you have filled up all the resources and

subsequently unloaded 2 mono plug-ins. This situation can be

seen in the diagram below.

As you can see above, the two remaining slots reside on

different DSP chips and in this case when you attempt to load

a stereo plug-in you will encounter the above mentioned

situation.

The way to handle this is as follows:
1. Save your project/song
2. Close your project/song
3. Re-open project/song
When this has been done Duende will be forced to reload all

the plug-ins but will do so in the most economical way

possible. The 2 free slots will now reside on the same DSP

chip allowing the loading of a stereo plug-in.

Advertising