Installing the New Water Heater (cont’d)

A gas line of sufficient size must be run to the water heater.

Consult the latest edition of National Fuel Gas Code ANSI

Z223.1, also referred to as NFPA 54 and the gas company

concerning pipe size.
There must be:

—A readily accessible manual shut off valve in the gas sup-

ply line serving the water heater, and

—A drip leg (sediment trap) ahead of the gas control valve

to help prevent dirt and foreign materials from entering

the gas control valve.

—A flexible gas connector or a ground joint union between

the shutoff valve and control valve to permit servicing of

the unit.

Be sure to check all the gas piping for leaks before lighting

the water heater. Use a soapy water solution, not a match

or open flame. Rinse off soapy solution and wipe dry.
When installed at elevations above 2,000 feet, input rat-

ings should be reduced at the rate of 4 percent for each

1,000 feet above sea level.

Gas Piping

WARNING

The appliance and its individual shutoff valve must be

disconnected from the gas supply piping system during

any pressure testing of that system at test pressures in

excess of

1

/

2

pound per square inch (3.5kPa).

The appliance must be isolated from the gas supply pip-

ing system by closing its individual manual shutoff valve

during any pressure testing of the gas supply piping sys-

tem at test pressures equal to or less than

1

/

2

pound per

square inch (3.5kPa).

WARNING

Make sure the gas supplied is the same type listed on the

model rating plate. The inlet gas pressure must not

exceed 10.5 in. water column (2.6kPa)for natural gas or

13 in. water column (3.2 kPa) for propane (L.P.) gas. The

minimum inlet gas pressure listed on the rating plate is

for the purpose of input adjustment.

WARNING

If the gas control valve is subjected to pressure exceed-

ing

1

/

2

pound per square inch (3.5kPa), the damage to

the gas control valve could result in a fire or explosion

from leaking gas.

WARNING

If the main gas line shutoff serving all gas appliances is used,

also turn “OFF” the gas at each appliance. Leave all gas

appliances turned “OFF” until the water heater installation

is complete.

VENTING THROUGH A ROOF (CONT’D)

2. Only 3

″ ABS Schedule 40 piping and fittings are acceptable

materials on the first five feet of the outlet vent system.

3. 3

″ PVC, ABS, or CPVC Schedule 40 piping and fittings are

acceptable materials for the inlet vent system and for the out-

let vent system after the first five feet.

4. It cannot be connected to existing vent piping or chimney.

5. It must terminate vertically to the outdoors.

6. The total vertical and horizontal vent runs cannot exceed the

maximum length with a maximum number of 90˚ elbows as

specified in the table below. If more elbows are required, the

venting distance must be reduced 5 feet for every 90° elbow.

18

3

″ DIA. VENTS

NUMBER OF 90˚ DEG.

MAX. LENGTH (FT.)

ELBOWS*

45

1

40

2

35

3

*NOTE: Two 45˚ elbows are equivalent to one 90˚ elbow.

One 90˚ elbow equals 5 feet of equivalent vent length.

TOTAL VERTICAL AND

HORIZONTAL RUNS - SEE

CHART ABOVE (ITEM 6).