Electrical, Warning, Electrical instructions – Southern Pride SC-200 User Manual

Page 10

Advertising
background image

9

ELECTRICAL

SC-100-SM

SC-200-SM

120 Volts AC

120/208 or 120/240 Volts AC

60 Hz

60 Hz

Single Phase

Single Phase

20 AMP wiring required

30 AMP wiring required

NOTE:

MAKE SURE THE SUPPLY POWER CORRESPONDS WITH

VOLTAGE SPECIFIED ON THE NAMEPLATE OF YOUR OVEN.

WARNING:

CHASSIS MUST BE GROUNDED TO PREVENT POSSIBLE

SHOCK HAZARD.

WARRANTY IS VOID IF THE OVEN IS CONNECTED TO ANY VOLTAGE
OTHER THAN THOSE SPECIFIED ABOVE.

ELECTRICAL INSTRUCTIONS

1. The SC-100-SM is shipped with a plug and wire suitable for a 20 amp hookup.

2. The SC-200-SM is shipped with no wire and plug due to varients in 208/240

volt plugs. Your electrician must provide 10 AWG stranded four wire cable and
appropriate plug for hookup in your situation.

3. Power must be OFF during installation of the SC-200 wire and plug.

4. Electrical service is provided at the terminal block on the SC-200, located behind
the access panel which is in the lower left corner of the back of the oven.

5. After connecting the proper electrical service, test the voltage at the terminal
block with a voltmeter.

6. If power is correct, replace the access panel and power up the oven.

Advertising