4 general operation – Sterling EX909 User Manual

Page 23

Advertising
background image

Page 23

4 General

Operation

4-1 Scope

This chapter contains the information required to carry out pre-
operational procedures, as well as general operation. The
checklist of items listed below should always be reviewed prior to
a production run.

4-2 Pre-Operational

Checklist

To ensure the granulator is ready for operation, perform the tasks
listed on the following pre-operational checklist. Make sure that
all electrical and mechanical machine elements are inspected and
any defects corrected first.

;

Have all installation and preparation instructions been read and
followed?

;

Have the granulator operators and all other necessary
personnel, such as the cleanout, maintenance and service
persons, been fully trained on machine operation and all
machine safety mechanisms?

;

Have the granulator operators and all other necessary
personnel, such as the cleanout, maintenance and service
persons, read the Operation and Installation Manual?

;

Have sufficient location clearances been allowed?

;

Has the equipment been grounded as required by local codes
and/or Article 250 of the National Electric Code?

;

Have all motors been checked for proper rotation?

;

Have all machine controls, pushbuttons, and limit switch
interlocks been checked for proper functioning?

;

Have the cutting chamber and breaker segregation chambers
been checked for foreign matter?

;

Have the drive components been checked for alignment and
tension?

;

Is the machine properly closed with all visible fasteners tight?

;

Are all accessory components electrically and mechanically
connected with proper support and with all fasteners tight?

Advertising
This manual is related to the following products: