Final installation checklist – Samsung DV218AG User Manual

Page 17

Advertising
background image

Installing your dryer

_17

FINAL INSTALLATION CHECKLIST

Dryer is plugged into electrical outlet and is properly grounded.

Exhaust ductwork is hooked up and joints are taped.

Plastic flexible duct is NOT used.

Used rigid or stiff-walled flexible metal vent material.

Dryer is leveled and is sitting firmly on the floor.

Gas models – gas is turned on with no gas leaks.

Start your dryer to confirm that it runs, heats, and shuts off.

01 Installing your dryer

DV218AEW-02568A_EN.indd 17

2008-03-14 ¿АИД 6:11:23

Advertising
This manual is related to the following products: