220v conversion, 220 vac, 110 vac – Southbend METAL-CUTTING BANDSAW SB1019 User Manual

Page 44

Advertising
background image

-42-

For Machines Mfg. Since 8/09

Model SB1019

E L E C T R I C A L

6. Remove the nuts that secure the metal jump-

ers on the terminal block. Stack the jump-

ers together, then place them both over the

terminals shown on the right side of Figure

47.

7. Make sure none of the wires have moved

from their original locations and the jumpers

are positioned exactly as shown on the right

side of Figure 47, then re-tighten the four

hex nuts on the terminal block.

4. Use a wire nut to connect wires #2 & #3,

then wrap them with electrical tape. Close

the motor junction box.

5. Open the pump motor junction box and

locate the motor terminal block shown in

Figure 47.

Figure 47. Rewired for 220V.

Hot

Hot

220 VAC

6-15 Plug

(As Recommended)

Pump

Motor

GND

1

1

2

2

2

3

3

3

4

1

2

3

4

1

1

2

2

3

3

4

4

4

U2

U2

V2

V2

4

Start Capacitor

3MFD 450 VAC

Limit Switch

Motor Overload

Reset Button

S. Cap

150MFD

250VAC

Saw Motor

110V

Rewired

for 220V

110V

Rewired

for 220V

(Note Jumper

Position)

Control

Box

Ground

Block

ON/OFF

Switch

(Viewed From Above)

Neutral

Hot

Ground

110 VAC

5-15 Plug

Ground

1

2

3

4

1

2

3

4

U2

V2

220

VAC

Rewired for 220V

Motor Terminal

Block

Jumpers

3. Re-tighten the wire nuts, making sure wire

#1 is still connected to the black wire com-

ing from the motor overload reset button and

that wire #4 is still connected to the red wire

coming from the cord. Wrap both wire nuts

and the end of the cords with electrical tape.

Items Needed

Qty.

220V Switch (Part No. PSB1019204) ...................1

Phillips Screwdriver #2 ........................................1

Wrench 18mm .......................................................1

Wire nut (sized for two 14 Ga. wires)...................1

Electrical Tape .......................................As needed

To convert the Model SB1019 to 220V:

1. DISCONNECT BANDSAW FROM POWER!

2. Open the motor junction box, then loosen the

wire nuts indicated in Figure 46. Remove

wires #2 & #3 from the wire nuts.

Figure 46. Wiring terminal locations.

Hot

Hot

220 VAC

6-15 Plug

(As Recommended)

Pump

Motor

GND

1

1

2

2

2

3

3

3

4

1

2

3

4

1

1

2

2

3

3

4

4

4

U2

U2

V2

V2

4

Start Capacitor

3MFD 450 VAC

Limit Switch

Motor Overload

Reset Button

S. Cap

150MFD

250VAC

Saw Motor

110V

Rewired

for 220V

110V

Rewired

for 220V

(Note Jumper

Position)

Control

Box

Ground

Block

ON/OFF

Switch

(Viewed From Above)

Neutral

Hot

Ground

110 VAC

5-15 Plug

Ground

1

2

3

4

1

2

3

4

U2

V2

220

VAC

Rewired for 220V

Wiring diagrams are provided in this section

showing the Model SB1019 wired for both 110V

and 220V. Refer to these diagrams if needed

when following this procedure.

220V Conversion

READ PAGE 41 BEFORE

DOING ANY WIRING!

Advertising