Normal removal & installation – Snapper Clean Sweep Twin Catcher User Manual

Page 12

Advertising
background image

Normal Removal &
Installation

10

Normal Removal & Installation

Collector Installation

Note: See previous pages for more detailed installation
and operation instructions if necessary.

1. Lift discharge deflector up (E, Figure 13).

2. Place the front hole of the lower chute (A) onto

carriage bolt (C) as shown. Slide front edge of lower
chute (A) under hinge bracket (G).

3. Place the rear hole of the lower chute (A) onto

carriage bolt (F) as shown.

4. Secure knob (B) onto carriage bolt (C) as shown.

5. Secure wing nut (D) onto carriage bolt (F) as shown.

6. Install the upright support (B, Figure 8) to hitch (A)

and secure with 3/8-16 x 1 capscrews (C) and
locknuts (D) as shown.

7. Install the bag and cover support (B, Figure 9) to

upright support (A) using reinforcement plate (C) and
3/8-16 x 1 capscrews (D) and 3/8-16locknuts (E) as
shown.

8. Attach cover assembly (B, Figure 10) to bag support

bracket (A) using hinge pivots (E). Secure cover
using cover hinge pins (C) and hair pins (D) as
shown.

9. Raise the cover (A, Figure 9), and attach collector

bags (B) using grass bag hanger (C) to bag hanger
post (D).

10. Slide the upper and middle tube (J, Figure 14)

aligning ridge (L) with cutout (M) as shown.

9. Slide middle and upper tube (J) over lower chute (H).

Pull strap (K) and place hole completely over pin (I).

C

E

D

A

B

Figure 13. Install Lower Discharge Chute
A. Lower Chute
B. Knob, 5/16-18
C. Front Carriage Bolt, 5/16-18 x 3/4
D. Wing Nut, 5/16
E. Discharge Deflector
F. Rear Carriage Bolt, 5/16-18 x 3/4
G. Hinge Bracket

F

G

Advertising