Checking off to do list items, Checking off a completed item, Changing priorities and due dates – Samsung SPH-I330 User Manual

Page 137: Changing the priority, due date and category

Advertising
background image

133

Checking OFF To Do List Items

When items are completed, they can be checked off to indicate the item
has been completed.

Checking off a Completed Item

1.

Tap the check box located on the left side of the “To Do List” item.

Note:

The To Do List can be set to display or hide items that have already

been checked off. By default, completed items will not be displayed but
are always stored until you delete them.

Changing Priorities and Due Dates

You can change the To Do List to display the due date assigned to an
item, change its priority, and assign a category to the task with the To Do
Item Details dialog box.

You can then sort To Do List items by priority, due date, or category.

Changing the Priority, Due Date and Category

1.

In the To Do List, tap the desired item.

2.

Tap the

Details

button.

3.

In the Details dialog box, tap the

Category

drop down menu. Select

the desired category, or create a new one.

4.

In the Details dialog box, tap the

Due Date

drop down menu.

Choose one of the following options:

Today

- Automatically inserts the date in the “Due Date” field.

Advertising
This manual is related to the following products: