Kobe Range Hoods IS2342SQ User Manual

Page 7

Advertising
background image

5

Telescopic Stack Installation

Note: Duct cover with telescopic stack sold separately.

1. Mark centerlines of cook top or range on ceiling above. Use centerlines marked on ceiling

to position the mounting template as shown in Figure 2.

2. Remove and save template. Cut and remove ceiling drywall. Install 2” x 4” cross framing

lumber (not provided) between ceiling joists. Refer to Figure 3. Consult a professional if

you have difficulty or your installation is unique.

3. Finish the ceiling surface. Be sure to mark the location of the ceiling joists and cross

framing, or replace the mounting template in the position of the ceiling joists & cross

framing.

4. Attach the telescopic stack to the ceiling and securely fasten to the joists and cross framing

with eight screws (not provided) as shown in Figure 3. Make sure screws are driven into

center of joists and cross framing for maximum support.

5. Adjust the telescopic stack using reference F calculated in Table 1 and measurements on

page 12. Tighten from the side with eight (4x8 mm) screws (provided) as shown in Figure

4.










Figure 2






Figure 3





Figure 4


Advertising