Kobe Range Hoods CH2736SQB User Manual

Page 9

Advertising
background image

7

UNDER THE CABINET INSTALLATION – TOP VENT

Preparation before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE

VENT OPENING.

- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.
- A straight, short venting run will allow the hood to perform more efficiently.

- Try to avoid as many transitions, elbows, and long run as possible. This may reduce

the performance of the hood.

- Temporarily wire the hood to test for proper operation before installing.
- Peel protective film off the hood (if any).
- For installing under the cabinet with recessed bottom, attach 4-inch wide wood filler

strips (not included) on each side. Refer to Figure 2.

- Measure and create access opening for electrical wires under the cabinet.
- Cut the multi duct exhaust according to the size of the venting pipe. Refer to Figure 3.

Figure 1 Figure 2
Figure 3

6

" Round Vent 7" Round Vent 3-1/4" x 10" Vent

Hood Installation

CAUTION: If required to move the cooking range to install the hood, turn off the power on an
electric range at the main electrical box. SHUT OFF THE GAS BEFORE MOVING A GAS
RANGE.

1.

Puncture the knockout holes on the hood as shown in Figure 4.

Advertising
This manual is related to the following products: