Kobe Range Hoods CX-183 User Manual

Page 6

Advertising
background image

4

INSTALLATION

PLEASE READ ENTIRE INSTRUCTIONS BEFORE PROCEEDING

Calculation before Installation

To calculate the length of the installation, please refer to Table 1. (All calculation is measure in

inches.)

TABLE 1

A = Height of Floor to Ceiling

B = Height of Floor to Counter Top

(Standard: 36”)

C = Preferred Height of Counter Top

to Hood Bottom (Recommended

27” to 30”)

D = Height of Hood

E = Height of the Hood Installation

[A – (B+C)]

F = Height of Duct Cover [E – D]

SAFETY W A RNIN G

HOOD MAY HAVE VERY SHARP EDGES; PLEASE WEAR PROTECTIVE GLOVES IF IT

IS NECESSARY TO REMOVE ANY PARTS FOR INSTALLING, CLEANING OR

SERVICING.

Preparations before Installation

NOTE: TO AVOID DAMAGE TO YOUR HOOD, PREVENT DEBRIS FROM ENTERING THE

VENT OPENING.

- Decide the location of the venting pipe from the hood to the outside. Refer to Figure 1.

- A straight, short venting run will allow the hood to perform more efficiently.

- Try to avoid as many transitions, elbows, and long run as possible. This may reduce

the performance of the hood.

- Use duct tape to seal the joints between pipe sections.

- If necessary, prepare back wall frame with cross framing lumber for secure installation.

Using references in Table 1 and measurements on page 13, decide the level of the

lumber. Refer to Figure 2.

Advertising
This manual is related to the following products: