Caution : install heating lamps last – Kobe Range Hoods CH0030SQB (30") User Manual

Page 10

Advertising
background image

7

Ductwork Installation

8. Use 8” round steel pipe (follow building codes in your

area) to connect the ducting transition on the hood to
the ductwork above. Use duct tape to make all joints
secure and air tight. Refer to Figure 5.

Wiring to Power Supply

S A F E T Y W A R N I N G

RISK OF ELECTRICAL SHOCK. THIS RANGE HOOD
MUST BE PROPERLY GROUNDED. MAKE SURE THIS
IS

DONE

BY

QUALIFIED

ELECTRICIAN

IN

ACCORDANCE WITH ALL APPLICABLE NATIONAL
AND LOCAL ELECTRICAL CODES.

BEFORE CONNECTING WIRES, SWITCH POWER OFF
AT SERVICE PANEL TO PREVENT POWER FROM
BEING SWITCHED ON ACCIDENTALLY.


9. Connect electrical wires.

-

Connect three wires (black, white and green) to
house wires and cap with wire connectors.
Connect wires according to their colors (i.e. black to
black, white to white, and green to green). See
Figure 6.

-

Store wires in the wiring box.

Final Assembly

CAUTION

: Install heating lamps last.

10. Drop oil tunnel into recess support near rear of hood.

Refer to Figure 7.

11. Install baffle filters and stainless spacer(s). Refer to

Measurements and Diagrams on page 21 for baffle
filter and stainless spacer placement. Angle baffle filter
toward back of hood

. Push baffle filter up until

almost level

. Slide forward into recess behind the

front of hood . Lower baffle filter . Slide back until
it fits into resting position . Refer to Figure 8.

12. Repeat for all baffle filters and spacers.
13. Install heating lamps (not included), 120 Volts 175

Watts max. each.






Figure 5

Figure 6

Figure 7

Advertising