1 running cables, 2 v750 cable and connector requirements, Figure 2-1. cable connector/adapters e-201-0101-01 – Kyocera VLSG-01 User Manual

Page 25: Running cables -3, V750 cable and connector requirements -3

Advertising
background image

INSTALLATION REQUIREMENTS

VanLink System featuring TouchStar™ Technology - Troll Systems Corporation

VanLink System Requirements

Document VLSG-01 - 10/21/08

2-3

2.3.3.1

Running Cables

Cables should only be installed by qualified personnel who are familiar with the electrical
requirements and safety precautions that are necessary to properly and safely install
(run) these items.

The cables should be inspected prior to installation. Connectors should be visually
inspected prior to connecting to their mating connector.

2.3.3.2

V750 Cable and Connector Requirements

The V750 cable and connector requirements are as follows:

Cabling consisting of four (4) wires will be required between the V750 and the
pan/tilt for azimuth and elevation feedback.

— Some pan/tilts may already have the potentiometers installed in which case the

wires needed may already be terminated and run through the NYCOIL.

The harness for the GPS/IMU can be extended to reach the roof of the vehicle if
necessary.

Refer to

Figure 2–1

p/n
TBD

Figure 2–1. Cable Connector/Adapters E-201-0101-01

Advertising