Installation & Operation Manual

8

6" (152 40 MM)

24" (610 MM)

REAR

0"

LEFT

OPEN FRONT

13" (330 MM)

TOP

0"

RIGHT

1/4” (6 MM) MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” (25 MM) MINIMUM CLEARANCE
AROUND VENT PIPES

Figure 1-2 Alcove Installation - Minimum Required Clearances

6" (152 MM)

FRONT

4" (330 MM)

TOP

0"

LEFT

0"

RIGHT

24" (610 MM)

REAR

6" (152 MM)

VENTILATING*

AIR OPENING

VENTILATING*
AIR OPENING

CLOSED DOOR

*AREA OF EACH OPENING:
1 SQ. INCH PER 1000 BTU PER HOUR INPUT
WITH A MINIMUM OF 100 SQ. INCHES

1/4” (6 MM) MINIMUM CLEARANCE
AROUND HOT WATER PIPES
1” (25 MM) MINIMUM CLEARANCE
AROUND VENT PIPES

Figure 1-1 Closet Installation - Minimum Required Clearances

ƽ WARNING

RECOMMENDED SERVICE
CLEARANCES:

Front

- 30" (762 mm)

Top

- 24" (610 mm)

Left Side - 24" (610 mm)
Rear - 24" (610 mm)

1

Determine boiler location

RECOMMENDED SERVICE
CLEARANCES:

Front

- 30" (762 mm)

Top

- 24" (610 mm)

Left Side - 24" (610 mm)
Rear - 24" (610 mm)

ƽ WARNING

For closet installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used in
a closet structure due to elevated
temperatures. Failure to follow
this warning could result in fire,
personal injury, or death.

For alcove installations, CPVC,
polypropylene or stainless steel
vent material MUST BE used
in an alcove structure due to
elevated temperatures. Failure to
follow this warning could result
in fire, personal injury, or death.