Flaring Work

Cut the pipes and the cable.

1. Use the piping kit accessory or the pipes

purchased locally.

2. Measure the distance between the indoor and

the outdoor unit.

3. Cut the pipes a little longer than measured

distance.

4. Cut the cable 1.5m(59.1in) longer than the

pipe length.

Burrs removal

1. Completely remove all burrs from the cut cross

section of pipe/tube.

2. Put the end of the copper tube/pipe in a

downward direction as you remove burrs in
order to avoid dropping burrs into the tubing.

Putting nut on

• Remove flare nuts attached to indoor and

outdoor unit, then put them on pipe/tube having
completed burr removal.
(not possible to put them on after flaring work)

Flaring work

• Carry out flaring work using flaring tool as

shown below.

Main cause for gas leakage is due to defect in flaring work. Carry out correct flaring work in the
following procedure.

mm

inch

mm

inch

Ш6.35

1/4

1.1~1.3

0.043~0.051

Ш9.52

3/8

1.5~1.7

0.059~0.066

Ш12.7

1/2

1.6~1.8

0.063~0.070

Ш15.88

5/8

1.6~1.8

0.063~0.070

Ш19.05

3/4

1.9~2.1

0.074~0.082

Outside diameter

A

Copper

pipe

90¡

Slanted Uneven Rough

Bar

Copper pipe

Clamp handle

Red arrow mark

Cone

Yoke

Handle

Bar

"A"

Pipe

Reamer

Point down

Firmly hold copper pipe in a die in the
dimension shown in the table above.