LG TC91 User Manual

Page 23

Advertising
background image

23

Compactor Owner’s Manual

Carrier oil should be clean and in accordance with the manufacturer's
recommendations.

After mounting the compactor on the boom and connecting the lines,
bleed all air from the hydraulic system.

Initially pump grease to the pins in the bracket until it oozes out around
the pins. Then grease with 10-15 shots daily.

Check torque of bolts and fasteners at installation and again after the first
10 hours of operation.

Operate all boom functions to ensure clearances are good and they allow
the compactor to swivel.

START-UP

Advertising
This manual is related to the following products: