Lightolier LytespanTrack Lighting System LAS56 User Manual

Is:las56

Advertising
background image

READ AND UNDERSTAND THESE INSTRUCTIONS BEFORE INSTALLING FIXTURE

This fixture is intended for installation in accordance with the National Electrical Code and local regulations. To

assure full compliance with local codes and regulations, check with your local electrical inspector before

installation. To prevent electric shock, turn off electricity at fuse box before proceeding.

Retain these instructions for maintenance reference.

INSTALLATION PROCEDURE FOR: LAS56 AIRSEAL GASKET KIT

WITH 1004, IC, R, ICR, S, SIC, SR, SICR AND 1104, IC, R, ICR, S, SIC, SR, SICR, F1, F1R

LYTENING FRAME-IN-KITS

INSTRUCTION SHEET NO.

IS:LAS56

A0402

Page 1 of 1

A

COMPANY

631 Airport Road, Fall River, MA 02720

.

.

.

1. Align bottom edge of HOUSING with CEILING

SURFACE (FIG. A) (FIG. D)
Note: STEP 1 Needed for “NEW
CONSTRUCTION” HOUSINGS only

2. Apply appropriate size FLANGE GASKET to

CEILING SURFACE around edge of HOUSING
and bend flaps up into inside surface of
HOUSING (FIG. B) (FIG. C)
Note: CEILING SURFACE must be clean and
free of dust and debris before applying
FLANGE GASKET
Careful placement is needed to avoid openings
that would void airseal rating.

3. Apply 3 SLOT COVERS over slots in “NEW

CONSTRUCTION” HOUSING or over spring
openings in “REMODELER” HOUSING (FIG. B)
Note: SLOT COVERS are not needed in “NEW
CONSTRUCTION” HOUSING if the HOUSING
didn’t need to be adjusted vertically to align with
the CEILING SURFACE and knock-outs are in
the slots

HOUSING

CEILING

FLANGE
GASKET
(1104 SERIES)

(1004 SERIES)

SLOT
COVER

FLANGE
GASKET

FLANGE
GASKET

REMODELER
HOUSING

CEILING
SURFACE

CEILING
SURFACE

NEW
CONSTRUCTION
HOUSING

FIG A

FIG B

FIG C

FIG D

Advertising